OEM Customized Gas Line Tubing - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

With our leading technology at the same time as our spirit of innovation,mutual cooperation, benefits and advancement, we will build a prosperous future with each other with your esteemed firm for High-Quality A252 GRADE 1 Steel Pipe , Stainless Steel Welded Pipe , X70 SSAW Line Pipe Factory , We believe this sets us apart from the competition and makes customers choose and trust us. We all wish to create win-win deals with our customers, so give us a call today and make a new friend!
OEM Customized Gas Line Tubing - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral Detail:

Product Description

Cangzhou Spiral Steel Pipes Group Co., Ltd have 4 production lines of anticorrosion & thermal insulation to perform the 3LPE coating and FBE coating. The maximum outside diameter can be 2600mm.

The coatings are suitable for the protection of buried or submerged steel pipes at design temperatures of -40℃ to +80℃.

The present standard specifies requirements for coatings that are applied to spirally welded steel pipes and fittings used for the construction of pipelines for conveying liquids or gases.

Applying this standard ensures that the PE coating provides sufficient protection against the mechanical thermal and chemical loads occurring during operation, transport, storage and installation.

Extruded coatings comprise three layers: an epoxy resin primer, a PE adhesive and an extruded polyethylene outer layer. The epoxy resin primer is applied as a powder. The adhesive can be applied either as a powder or by extrusion. For extruded coatings a differentiation is made between sleeve extrusion and sheet extrusion. Sintered polyethylene coatings are single or multi-layer systems. The polyethylene powder is fused onto the pre-heated component until the desired coating thickness is reached.

Epoxy resin primer

The epoxy resin primer is to be applied in powder form. The minimum layer thickness is 60μm.

PE adhesive

The PE adhesive can be applied in powder form or extruded. The minimum layer thickness is 140μm. the peel strength requirements vary depending on whether the adhesive was applied as a powder or was extruded.

Polyethylene coating

The polyethylene coating is applied either by sintering or by sleeve or sheet extrusion. The coating is to be cooled after application to avoid unwanted deformation during transport. Depending on the nominal size, there are different minimum values for the normal total coating thickness. In the case of increased mechanical loads the minimu layer thickess shall be increased by 0.7mm. minimum layer thickness are given in table 3 below.

product-description1


Product detail pictures:

OEM Customized Gas Line Tubing - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral detail pictures

OEM Customized Gas Line Tubing - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral detail pictures

OEM Customized Gas Line Tubing - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral detail pictures


Related Product Guide:

Our company puts emphasis on the management, the introduction of talented personnel, and the construction of staff building, trying hard to improve the quality and liability consciousness of staff members. Our company successfully attained IS9001 Certification and European CE Certification of OEM Customized Gas Line Tubing - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral , The product will supply to all over the world, such as: Plymouth, Belgium, Slovenia, For more than ten years experience in this filed, our company has gained high reputation from home and abroad. So we welcome friends from all over the world to come and contact us, not only for business, but also for friendship.
  • As a veteran of this industry, we can say that the company can be a leader in the industry, select them is right.
    5 Stars By Carey from Mongolia - 2017.03.07 13:42
    A nice supplier in this industry, after a detail and careful discussion, we reached a consensus agreement. Hope that we cooperate smoothly.
    5 Stars By Jamie from Johannesburg - 2017.08.18 11:04
    Write your message here and send it to us