Hot New Products Sewer Cleanout Pipe - Fusion-Bonded Epoxy Coatings Awwa C213 Standard – Spiral

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We attempt for excellence, company the customers, hopes to be the top cooperation team and dominator company for personnel, suppliers and customers, realizes price share and continual marketing for Straight Welded Pipe , Stainless Pipe Welding , Fbe Piping , Welcome any inquiry to our firm. We will be happy to ascertain helpful business enterprise relationships along with you!
Hot New Products Sewer Cleanout Pipe - Fusion-Bonded Epoxy Coatings Awwa C213 Standard – Spiral Detail:

Physical properties of epoxy powder materials

Specific gravity at 23℃: minimum 1.2 and maximum 1.8
Sieve analysis: maximum 2.0
Gel time at 200 ℃: less than 120s

Abrasive blast cleaning

Bare steel surfaces shall be abrasive blast-cleaned in accordance with SSPC-SP10/NACE No. 2 unless otherwise specified by the purchaser. The blast anchor pattern or profile depth shall be 1.5 mil to 4.0 mil(38 µm to 102 µm) measured in accordance with ASTM D4417.

Preheating

Pipe that has been cleaned shall be preheated at temperature less than 260℃, the heat source shall not contaminate the pipe surface.

Thickness

The coating powder shall be applied to the preheated pipe at a uniform cure-film thickness of not less than 12 mils(305μm) on the exterior or interior. The maximum thickness shall not exceed a nominal 16 mils(406μm) unless recommended by the manufacturer or specified by the pruchaser.

Optional epoxy performance testing

The purchaser may specify additional testing to establish epoxy performance. The following test procedures, all of which shall be performed on production pipe test rings, may be specified:
1. Cross-section porosity.
2. Interface porosity.
3. Thermal analysis (DSC).
4. Permanent strain (bendability).
5. Water soak.
6. Impact.
7. Cathodic disbondment test.


Product detail pictures:

Hot New Products Sewer Cleanout Pipe - Fusion-Bonded Epoxy Coatings Awwa C213 Standard  – Spiral detail pictures

Hot New Products Sewer Cleanout Pipe - Fusion-Bonded Epoxy Coatings Awwa C213 Standard  – Spiral detail pictures

Hot New Products Sewer Cleanout Pipe - Fusion-Bonded Epoxy Coatings Awwa C213 Standard  – Spiral detail pictures


Related Product Guide:

As for competitive prices, we believe that you will be searching far and wide for anything that can beat us. We can state with absolute certainty that for such quality at such prices we are the lowest around for Hot New Products Sewer Cleanout Pipe - Fusion-Bonded Epoxy Coatings Awwa C213 Standard – Spiral , The product will supply to all over the world, such as: New York, Frankfurt, Eindhoven, We are in continuous service to our growing local and international clients. We aim to be worldwide leader in this industry and with this mind; it is our great pleasure to serve and bringing the highest satisfaction rates among the growing market.
  • Sales manager is very enthusiastic and professional, gave us a great concessions and product quality is very good,thank you very much!
    5 Stars By Lisa from Southampton - 2017.08.15 12:36
    We have been appreciated the Chinese manufacturing, this time also did not let us disappoint,good job!
    5 Stars By Hazel from Egypt - 2017.04.18 16:45
    Write your message here and send it to us