Factory Wholesale Welding Round Tube Steel - Seamless Alloy Steel Pipe ASME SA335 GRADE P11, P12, P22, P91, P92 – Spiral
Factory Wholesale Welding Round Tube Steel - Seamless Alloy Steel Pipe ASME SA335 GRADE P11, P12, P22, P91, P92 – Spiral Detail:
Specification
Usage |
Specification |
Steel Grade |
Seamless Steel Tube for High Pressure Boiler |
GB/T 5310 |
20G, 25MnG, 15MoG, 15CrMoG, 12Cr1MoVG, |
High Temperature Seamless Carbon Steel Nominal Pipe |
ASME SA-106/ |
B, C |
Seamless Carbon Steel Boil Pipe used for High Pressure |
ASME SA-192/ |
A192 |
Seamless Carbon Molybdenum Alloy Pipe used for Boiler and Superheater |
ASME SA-209/ |
T1, T1a, T1b |
Seamless Medium Carbon Steel Tube & Pipe used for Boiler and Superheater |
ASME SA-210/ |
A-1, C |
Seamless Ferrite and Austenite Alloy Steel Pipe used for Boiler, Superheater and Heat Exchanger |
ASME SA-213/ |
T2, T5, T11, T12, T22, T91 |
Seamless Ferrite Alloy Nominal Steel Pipe applied for High Temperature |
ASME SA-335/ |
P2, P5, P11, P12, P22, P36, P9, P91, P92 |
Seamless Steel Pipe made by Heat-resistant Steel |
DIN 17175 |
St35.8, St45.8, 15Mo3, 13CrMo44, 10CrMo910 |
Seamless Steel Pipe for |
EN 10216 |
P195GH, P235GH, P265GH, 13CrMo4-5, 10CrMo9-10, 15NiCuMoNb5-6-4, X10CrMoVNb9-1 |
Product detail pictures:

Related Product Guide:
Using a total scientific good quality management process, superior high quality and excellent faith, we get great name and occupied this field for Factory Wholesale Welding Round Tube Steel - Seamless Alloy Steel Pipe ASME SA335 GRADE P11, P12, P22, P91, P92 – Spiral , The product will supply to all over the world, such as: Juventus, St. Petersburg, Miami, To create more creative products, maintain high-quality products and update not only our products but ourselves so as to keep us ahead of the world, and the last but most vital one: to make every client satisfied with everything we offer and to grow stronger together. To be the real winner, starts here!

Good quality and fast delivery, it's very nice. Some products have a little bit problem, but the supplier replaced timely, overall, we are satisfied.
