Factory Cheap Hot Insulated Water Line - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We often persist with the theory Quality To start with, Prestige Supreme. We are fully committed to delivering our clientele with competitively priced good quality items, prompt delivery and experienced support for Pipe Line Construction , Fbe Internal Pipe Coating , Welding Schedule 40 Black Pipe , We have been searching ahead to even better cooperation with overseas buyers dependant on mutual benefits. Be sure to really feel totally free to speak to us for additional element!
Factory Cheap Hot Insulated Water Line - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral Detail:

Product Description

Cangzhou Spiral Steel Pipes Group Co., Ltd have 4 production lines of anticorrosion & thermal insulation to perform the 3LPE coating and FBE coating. The maximum outside diameter can be 2600mm.

The coatings are suitable for the protection of buried or submerged steel pipes at design temperatures of -40℃ to +80℃.

The present standard specifies requirements for coatings that are applied to spirally welded steel pipes and fittings used for the construction of pipelines for conveying liquids or gases.

Applying this standard ensures that the PE coating provides sufficient protection against the mechanical thermal and chemical loads occurring during operation, transport, storage and installation.

Extruded coatings comprise three layers: an epoxy resin primer, a PE adhesive and an extruded polyethylene outer layer. The epoxy resin primer is applied as a powder. The adhesive can be applied either as a powder or by extrusion. For extruded coatings a differentiation is made between sleeve extrusion and sheet extrusion. Sintered polyethylene coatings are single or multi-layer systems. The polyethylene powder is fused onto the pre-heated component until the desired coating thickness is reached.

Epoxy resin primer

The epoxy resin primer is to be applied in powder form. The minimum layer thickness is 60μm.

PE adhesive

The PE adhesive can be applied in powder form or extruded. The minimum layer thickness is 140μm. the peel strength requirements vary depending on whether the adhesive was applied as a powder or was extruded.

Polyethylene coating

The polyethylene coating is applied either by sintering or by sleeve or sheet extrusion. The coating is to be cooled after application to avoid unwanted deformation during transport. Depending on the nominal size, there are different minimum values for the normal total coating thickness. In the case of increased mechanical loads the minimu layer thickess shall be increased by 0.7mm. minimum layer thickness are given in table 3 below.

product-description1


Product detail pictures:

Factory Cheap Hot Insulated Water Line - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral detail pictures

Factory Cheap Hot Insulated Water Line - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral detail pictures

Factory Cheap Hot Insulated Water Line - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral detail pictures


Related Product Guide:

Quality comes first; service is foremost; business is cooperation is our business philosophy which is constantly observed and pursued by our company for Factory Cheap Hot Insulated Water Line - Outside 3LPE coating DIN 30670 inside FBE coating – Spiral , The product will supply to all over the world, such as: Melbourne, Latvia, Mauritius, With a wide range, good quality, reasonable prices and stylish designs, our products are extensively used in beauty and other industries. Our products are widely recognized and trusted by users and can meet continuously changing economic and social needs.
  • The factory technical staff gave us a lot of good advice in the cooperation process, this is very good, we are very grateful.
    5 Stars By Bruno Cabrera from Muscat - 2017.09.28 18:29
    We have been appreciated the Chinese manufacturing, this time also did not let us disappoint,good job!
    5 Stars By Joyce from Norway - 2017.11.11 11:41
    Write your message here and send it to us