2021 China New Design Underground Pipe Line - Fusion-Bonded Epoxy Coatings Awwa C213 Standard – Spiral

Short Description:


Product Detail

Product Tags

Related Video

Feedback (2)

We stay with our company spirit of Quality, Performance, Innovation and Integrity. We goal to create more value for our clients with our abundant resources, advanced machinery, experienced workers and superb solutions for High-Quality Large Diameter Welded Pipes , High-Quality Steel Pipe Piles Of Cylindrical Shape , Gas Line For Stove , Currently, we are looking forward to even greater cooperation with overseas customers based on mutual benefits. Please feel free to contact us for more details.
2021 China New Design Underground Pipe Line - Fusion-Bonded Epoxy Coatings Awwa C213 Standard – Spiral Detail:

Physical properties of epoxy powder materials

Specific gravity at 23℃: minimum 1.2 and maximum 1.8
Sieve analysis: maximum 2.0
Gel time at 200 ℃: less than 120s

Abrasive blast cleaning

Bare steel surfaces shall be abrasive blast-cleaned in accordance with SSPC-SP10/NACE No. 2 unless otherwise specified by the purchaser. The blast anchor pattern or profile depth shall be 1.5 mil to 4.0 mil(38 µm to 102 µm) measured in accordance with ASTM D4417.

Preheating

Pipe that has been cleaned shall be preheated at temperature less than 260℃, the heat source shall not contaminate the pipe surface.

Thickness

The coating powder shall be applied to the preheated pipe at a uniform cure-film thickness of not less than 12 mils(305μm) on the exterior or interior. The maximum thickness shall not exceed a nominal 16 mils(406μm) unless recommended by the manufacturer or specified by the pruchaser.

Optional epoxy performance testing

The purchaser may specify additional testing to establish epoxy performance. The following test procedures, all of which shall be performed on production pipe test rings, may be specified:
1. Cross-section porosity.
2. Interface porosity.
3. Thermal analysis (DSC).
4. Permanent strain (bendability).
5. Water soak.
6. Impact.
7. Cathodic disbondment test.


Product detail pictures:

2021 China New Design Underground Pipe Line - Fusion-Bonded Epoxy Coatings Awwa C213 Standard  – Spiral detail pictures

2021 China New Design Underground Pipe Line - Fusion-Bonded Epoxy Coatings Awwa C213 Standard  – Spiral detail pictures

2021 China New Design Underground Pipe Line - Fusion-Bonded Epoxy Coatings Awwa C213 Standard  – Spiral detail pictures


Related Product Guide:

Our rewards are reduce selling prices,dynamic revenue team,specialized QC,sturdy factories,superior quality services for 2021 China New Design Underground Pipe Line - Fusion-Bonded Epoxy Coatings Awwa C213 Standard – Spiral , The product will supply to all over the world, such as: Cyprus, Seattle, Lesotho, Over the years, with high-quality solutions, first- class service, ultra-low prices we win thee trust and favor of customers. Nowadays our products sell all over the domestic and abroad. Thanks for the regular and new customers support. We offer high quality product and competitive price, welcome the regular and new customers cooperate with us!
  • Although we are a small company, we are also respected. Reliable quality, sincere service and good credit, we are honored to be able to work with you!
    5 Stars By Maud from Lesotho - 2018.10.09 19:07
    The company comply with the contract strict, a very reputable manufacturers, worthy a long-term cooperation.
    5 Stars By Beryl from panama - 2017.08.21 14:13
    Write your message here and send it to us